2008 Improvements

The house was pretty much completely re-done from March-July of 2008. Work done included:

New Kitchen

Cabinets, counter tops, sink, fixtures, appliances, pantry, tile floor, walls, insulation plumbing and electrical

New Baths

Cabinets, counter tops, fixtures, tub/shower, toilets, tile, walls, electrical and plumbing

All Flooring
Tile in dining room, kitchen, and both bathrooms
Hardwood flooring in family room, hallways and 2 bedrooms
Carpet on stairs and in master bedroom

Walls
New walls and insulation were installed in Kitchen, dining room, downstairs bath, and living room

Paint
The entire house was repainted

Appliances
washer, dryer, refrigerator, down-draft range, dishwasher and microwave

Kitchen tools
Toaster, coffee maker, blender, pots, pans, cutlery, utensils, dishes and glasses

Furniture
All new furniture including: beds, mattresses, couches, tables (bedside, family room and kitchen) and outdoor furniture.

Misc
Furnace/water heater, sliding glass doors (6), gas grill, outdoor shower, 5 bedroom septic, white shell driveway, landscaping, drapery and bedding